The SEENEOH project
From 2013 to 2014 TEXSYS has studied and developed the SCADA system of the SEENEOH estuarial test site of hydrokinetic turbines. This test site is deployed nearby the “Pont de Pierre” in the center of Bordeaux.
After two years of project standby, the electrical substation is connected to the grid and the hydrokinetic turbines floating platforms are anchored on the Garonne River. TEXSYS is now back on the project for the final integration and commissioning of the SCADA during the first half of 2017.